Common building defects in Oran Park NSW
The weight of them sits early: thirty seven at slab, thirty six at frame, twenty eight at lock-up. By handover the list is mostly presentation, which is the shape you want to see and is an argument for spending your inspection budget at the front of the build rather than the end. Only twenty three of the hundred and thirty eight are flagged as major, and the majors cluster in the slab and frame sets.
Fully licensed & accredited
-
NSW Fair Trading -
Australian Society of Building Consultants -
Strata Community Association -
Building Dispute Practitioners Society
Slab: termite collars, re-entrant reinforcement, cover, beam widths, vapour barrier.
Frame: metal straps, tie down bolts, steel connections, jamb studs, junction nailing.
Lock-up: insulation not installed, gas and hot water pipe contact, flashings, noggings.
Waterproofing: flange detail and protecting the membrane before tiling.
Handover: mostly painting and finish, with downlight clearance the notable safety item.
More about Oran Park
- Building a new home in Oran Park NSW
- Buying a home in Oran Park NSW
- Growth and development in Oran Park NSW
- Certifiers, council and building disputes in Oran Park NSW
- Ground conditions and slabs in Oran Park NSW
- Termite collars at slab stage in Oran Park NSW
- Insulation at lock-up in Oran Park NSW
Written by our local inspection team from work carried out in Oran Park. Licensed building practitioners.