Building and timber pest together, in one attendance and one booking.
The building component follows AS 4349.1 and the timber pest component AS 4349.3, with termite management systems assessed against AS 3660. The pest component sets down evidence and conducive conditions as at the day of attendance. Nothing is treated and no pest free status is certified.
0 checkpoints across 0 areas on a standard Oran Park building and pest inspection. We need access to the lot and the builder aware we are coming. Where a stage is unfinished we record that rather than passing it.
Termite protection and site conditions recorded on Oran Park jobs.





New Construction Stage Inspections Seven checks through an Oran Park build, before each stage is covered.
Pre-Handover (PCI) Inspections The final list while the last payment is still in your account.
Defect Investigation Reports A single failure, traced to what was actually required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of Oran Park's young resale stock. Instant online pricing, or talk to the booking team on 1300 471 805.
It cannot, which is the point. Once the concrete is down the penetration is sealed permanently around whatever is or is not there. Confirming it before the pour is the only opportunity.
No. It is one part of a management system under AS 3660, alongside perimeter treatment and inspection zones. Missing collars simply mean one route is left open.
No. Treating, and the warranty attached to it, is a licensed pest controller's work. We keep inspection separate so the report owes nothing to anyone selling a remedy.