Fixing stage inspection in Oran Park

Joinery in, painter not started, external brickwork due to be made good.

  • After mouldings, doors and joinery, before the painter
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Oran Park inspectionSend the address and the stage due.

Fully licensed & accredited

Stage5 of 7
When to bookAfter mouldings, doors and joinery, before the painter
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2017 and your contract selections

What is included in a Oran Park fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Oran Park builds

Fixing stage in Oran Park catches the brickwork and the external joints. Mortar blown out or damaged, acid wash still required, expansion joints needing cleaning and sealing, gutter brackets not clipped, balustrades not installed and grading still to be done. These are the items that get waved through at handover because the house looks finished, so catching them while the trades are still on site is the difference between a fix and a warranty claim.

What we find at this stage in Oran Park

  • Mortar blown out or damaged
  • Acid wash still required to brickwork
  • Expansion joints needing cleaning and sealing
  • Gutter brackets not clipped
  • Balustrades not installed, grading still required
Gutter brackets not clipped, Oran Park
Gutter brackets not clipped
Sample findings

Sample defects found during our fixing inspections in Oran Park

Annotated findings from Fixing inspections on Oran Park builds. Client addresses withheld.

Mortar blown out or damaged, recorded during a fixing stage inspection in Oran Park
Mortar blown out at the joint
Acid wash required, recorded during a fixing stage inspection in Oran Park
Brickwork awaiting acid wash
Clean inside the joints, recorded during a fixing stage inspection in Oran Park
Expansion joint needing cleaning
Balustrade not installed, recorded during a fixing stage inspection in Oran Park
Balustrade not installed

The other stages of a Oran Park build

  1. Bored piers inspection in Oran Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Oran Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Oran Park3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Oran Park4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Waterproofing inspection in Oran Park6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Oran Park7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Oran Park →

Guides

Construction stage guides for Oran Park

All guides →

Book a fixing inspection in Oran Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Oran Park: common questions

What does blown out mortar mean?

Mortar that has failed at the joint face, leaving the perpend or bed open. It lets water into the cavity and it is a bricklaying rectification rather than a cleaning job.

Is acid wash a defect?

Not in itself. It is a finishing operation, and recording that it has not been done stops it being quietly skipped between fixing and handover.

Why do expansion joints need cleaning?

Because mortar and debris in the joint stop it doing its job. A joint packed solid is not an expansion joint, it is a line drawn on a rigid wall.

Paint covers a lot, doesn't it?

Paint covers precisely the gaps, joints and knocks this visit is meant to catch, which is why it happens before the painter and not after.

How much time does the visit take?

Two to three hours for a standard house, with the report out that evening or early the next morning.

Worth booking with a handover inspection?

On most builds yes, because it is the last point wet area and external work can be corrected cheaply.