Oran Park Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Lock-up inspection in Oran Park

Roof on, brickwork up, services in, and the last look before the linings.

  • After roof, cladding and external doors, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Oran Park inspectionSend the address and the stage due.

Fully licensed & accredited

Stage4 of 7
When to bookAfter roof, cladding and external doors, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Oran Park lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Oran Park builds

Lock-up in Oran Park is the insulation stage as much as anything. We have recorded wall and ceiling insulation simply not installed on separate jobs, which is the sort of omission that is invisible from the day the plasterboard goes up and shows itself later as a house that costs more to heat than it should. Alongside that: gas pipes in contact with hot water lines, roof flashings, noggings missing and external doors not installed.

What we find at this stage in Oran Park

  • Wall and ceiling insulation not installed
  • Gas pipes in contact with hot water pipes
  • Roof flashings requiring attention
  • Noggings missing from the frame
  • External doors not installed, brickwork needing acid wash
Roof flashings at lock-up, Oran Park
Roof flashings at lock-up
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Oran Park

Annotated findings from Lock-up (pre-plaster) inspections on Oran Park builds. Client addresses withheld.

Wall and ceiling insulation not installed, recorded during a lock-up inspection in Oran Park
Insulation not installed
Wall and ceiling insulation not installed, recorded during a lock-up inspection in Oran Park
A second area without insulation
Gas pipes in contact with hot water pipes, recorded during a lock-up inspection in Oran Park
Gas pipe against a hot water line
Missing noggings, recorded during a lock-up inspection in Oran Park
Noggings missing from the frame

The other stages of a Oran Park build

  1. Bored piers inspection in Oran Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Oran Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Oran Park3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Fixing inspection in Oran Park5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Oran Park6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Oran Park7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Oran Park →

Guides

Construction stage guides for Oran Park

All guides →

Book a lock-up (pre-plaster) inspection in Oran Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Oran Park: common questions

How would I know if insulation was missed?

You would not, once the plaster is on. It is one of the clearest arguments for inspecting at lock-up, because the wall is open for a few days and then never again.

Does missing insulation breach anything?

It is a contract and Code compliance question, since the energy rating your house was approved against assumes it is there. The report records where it is absent.

Are pre-plaster and lock-up interchangeable terms?

Yes. The stage is defined by services being in and linings not, which here runs a few days.

What about the gas and hot water pipes?

A clearance is required between them. It is a straightforward fix while the wall is open and effectively impossible afterwards.

How long will you be there?

About two hours plus the report, longer on a larger or two storey home.

And if plastering has started?

We inspect what is still open and record which areas were already closed and therefore not assessed.

CallGet a Free Quote