For established Oran Park homes, a visual inspection carried out to AS 4349.1.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society A pre-purchase inspection is carried out to AS 4349.1, a visual inspection of readily accessible areas reporting significant items, conditions conducive to structural damage and safety hazards.
30 checkpoints across 10 areas on a standard Oran Park pre-purchase building inspection. We need access to the lot and the builder aware we are coming. Where a stage is unfinished we record that rather than passing it.
This page carries no defect grid, and the reason is set out below.
New Construction Stage Inspections Seven checks through an Oran Park build, before each stage is covered.
Pre-Handover (PCI) Inspections The final list while the last payment is still in your account.
Dilapidation Reports Cracks and finishes recorded at your Oran Park home before construction next door.
Building and Pest Inspections Both inspections in a single visit, each written up on its own.
Apartment and Strata Inspections An Oran Park strata lot inspected, with lot and common property items told apart. Instant online pricing for Oran Park, or contact the booking team.
Yes. A ten year old house has had a decade for handover shortcuts to show themselves, and for an owner to add a deck, a pergola or a bathroom without approval.
No power is turned on and no circuit tested, no pipework is pressurised, no appliance is operated, nothing is dismantled and no engineering is signed off. Timber pests are separate, under AS 4349.3.